First-Ever Triple Black Hole System Detected Through Gravitational Waves

For the first time, a system of three black holes has been identified, locked in a complex dance akin to that of the Earth and Moon orbiting each other while simultaneously circling the Sun. The presence of the third black hole, which had remained hidden until now, was inferred from gravitational waves detected in 2019 by the American LIGO observatory. These waves were produced by the merger of the other two black holes and have now been reanalyzed in a study led by the Chinese Academy of Sciences and published in *The Astrophysical Journal Letters*.

The 2019 detection captured ripples in spacetime caused by the violent merger of two black holes with masses of 23 and 2.6 times that of the Sun, respectively. The significant disparity in their masses surprised astronomers. Now, researchers led by Shu-Cheng Yang propose this imbalance can be explained by the gravitational influence of a third, supermassive black hole—at least 100,000 solar masses—which provided the necessary push for the collision.

By running simulations with the available data, the study’s authors identified a characteristic signature confirming the third black hole’s presence. A subsequent re-examination of the LIGO data proved this signature was indeed there.

“This is the first international discovery of clear evidence for a third object in a binary black hole merger event,” stated study co-author Wen-Biao Han.

The triple system has now likely transformed into a more classic binary system. According to the researchers, the new black hole born from the merger will probably continue to orbit its colossal partner for billions of years before finally being consumed.

© Copyright ANSA – All rights reserved

share this news:

Facebook
Twitter
WhatsApp
Telegram

看看这些相关内容

意企投1100万欧建水利设施惠及民生

近日,意大利圣培露集团在贝加莫省启动一项价值1100万欧元的水利项目,旨在保障当地主要水源Nossana泉的持续供应,应对极端天气事件。项目包括新建水处理设施,预计2026年完工,完成后将捐赠给当地水务公司Uniacque,惠及超过31.5万居民。 圣培露集团首席执行官米歇尔·贝内文蒂表示,可持续水资源管理是集团核心战略,此项投资将助力当地社区发展。Uniacque公司首席执行官皮耶兰杰洛·贝托基称,该设施将提升水质与管理可持续性。贝加莫市长埃琳娜·卡尔内瓦利等地方官员对此表示满意,强调项目兼具经济与环境效益。 该项目是圣培露集团自2020年起推出的4000万欧元投资计划的一部分,重点保护水资源与生物多样性。

Read More